Think With Logix provides relevant and timely content to help builders solve their biggest problem – a shortage of skilled labor.

Wall to Roof Transitions and How to Effectively Maintain the Four Control Layers
In a previous Logix Brands blog post “Transition Details at Grade” were reviewed and one finding was that failures often don’t occur in the field

A Quick Overview Of The Functions of the Four Control Layers In A Building Envelope
Buildings need a lot of things to be successful. As Joseph Lstiburek, Ph.D. from Building Science Corporation would say, “What we call things tell us

Builder Success Story – True Build Contractors
These are challenging times for builders — skilled labor shortages persist, the cost of materials and fuel are too volatile for comfort and lead times

Builder Success Story: Setting A High Performance Precedent With Locally Available Labor Skills
Why The True Build Team Chose Logix ICF Walls Below and Above-Grade They chose Logix ICF as his solution for below- and above-grade walls because this

The Building Science Behind: How Exterior Continuous Insulation (ci) Can Help to Manage Condensation in Above Grade Wall Assemblies
Adding exterior continuous insulation such as, Halo® Exterra®, to an above grade wall assembly helps to keep the air behind the foam board insulation at a

From Proper Detailing to Achieving Effective R24
R24 detail using Logix ICF, Halo Subterra and Halo Exterra Last month our Think with Logix® blog post looked at four transition details at grade for a cold